266: Sunday 19th January 2014

Mesh arrived in sheet form.
----
Front bumper off and onto bench ready for mesh and spotlights.
----
Mesh was marked about 15mm around openings, then cut with a big pair of normal scissors. Sore fingers though and scissors probably not their best now.
----
I bent the edges of the mesh over the openings and tapped them down with a small hammer then I applied blobs and scrapes of fibreglass mash (P40) to the folded edges.
----
driving spots added by simple marking, drilling and screwing to the bumper. Still need to connect them and adjust the beams.

No comments:

Post a Comment