45: Friday 28th August 2009
Built a control box for all the circuits need to run the EV. Wired up the connectors on the lid of the control box ready for testing.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment